Powering up the system and initial loading Page 333 of 456

Procedure 58

Testing Core/Net 0

From Core/Net 0, perform these tests:

1Perform a redundancy sanity test:

LD 135

Load program

STAT CPU Get status of CPU and memory

TEST CPU

Test CPU

2Check the LCD states:

a.Perform a visual check of the LCDs.

b.Test LCDs:

LD 135

Load program

TEST LCDs

Test LCDs

DSPL ALL

 

3Test the System Utility cards and the cCNI cards:

LD 135

Load program

STAT SUTL

Get the status of the System Utility card

TEST SUTL

Test the System Utility card

STAT CNI c s

Get status of cCNI cards (core, slot)

TEST CNI c s

Test cCNI (core, slot)

4Test system redundancy:

LD 137

Load program

TEST RDUN

Test redundancy

DATA RDUN

Test database integrity

STAT FMD

Status of one or both Fixed Media Devices

 

(FMD)

STAT RMD

Status of one or both Removable Media Devices

 

(RMD)

5Install the two system monitors. Test that the system monitors are working:

LD 37

Load program

ENL TTY x Enable the XMS, where x= system XMS

Communication Server 1000M and Meridian 1 Large System Installation and Commissioning