
Page 394 of 456 Installing a Signaling Server
—Insert the end of a longer
—Insert the other end of the
2Connect the Signaling Server to the TLAN subnet.
•if the Call Server is not connected to the Media Gateway Controller (MGC)
—Insert the end of one of the
—Insert the other end of the
•if the Call Server is connected to the MGC
—Insert the end of a longer
—Insert the other end of the
End of Procedure
Note: If the Call Server is connected to the Media Gateway Controller, you can not use the
Complete Procedure 75 to connect a Nortel CP PM Signaling Server (model NTDW66AAE5) to the ELAN and TLAN subnets of a CS 1000M system.
IMPORTANT!
Connecting a Nortel CP PM Signaling Server to the ELAN and TLAN subnets of a CS 1000M system causes a service disruption.