Cabling network modules and loops | Page 241 of 456 |
|
|
Figure 102
3PE faceplate connection between the Core/Net modules
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| NT8D80AZ cable |
|
|
|
|
|
|
|
|
|
|
|
| ||
Net |
|
|
|
|
|
|
|
|
|
|
| Core |
|
| Net |
|
|
|
|
|
|
|
|
|
|
| Core |
|
|
|
|
| NetworkSuperloopCard |
| NetworkSuperloopCard |
| NetworkSuperloopCard |
|
|
| SignalingPeripheralCard | cCNI | SYS | CP |
|
|
| NetworkSuperloopCard |
| NetworkSuperloopCard |
| NetworkSuperloopCard |
|
|
| SignalingPeripheralCard | cCNI | SYS | CP |
PS | CardConference/TDS |
|
|
|
|
| cardControllerCIock | UTIL | PIV | PS | CardConference/TDS |
|
|
|
|
| cardControllerCIock | UTIL | PIV | ||||||||||
|
|
|
|
| A |
|
|
|
|
|
|
| A |
|
| ||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
| B | Enb |
|
|
|
|
|
|
|
|
|
|
|
|
| B | Enb |
|
|
|
|
|
|
|
|
|
|
|
|
| Enb |
|
|
|
|
|
|
|
|
|
|
|
|
|
| Enb |
|
|
|
|
|
|
|
|
|
|
|
|
|
| Dis | Dis |
|
|
|
|
|
|
|
|
|
|
|
|
| Dis | Dis |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| INIT |
|
|
|
|
|
|
|
|
|
|
|
|
| INIT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| RESET |
|
|
|
|
|
|
|
|
|
|
|
|
| RESET |
|
| NT8D17 |
| NT8D04 |
| NT8D04 |
| NT8D04 |
|
| NTRB53 | QPC43R |
|
|
|
| NT8D17 |
| NT8D04 |
| NT8D04 |
| NT8D04 |
|
| NTRB53 | QPC43R |
|
|
|
PS | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 c9 c10 c11 c12 c13 c14 c15 CP | PS | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 c9 c10 c11 c12 c13 c14 c15 CP |
|
NT8D80AZ cable |
End of Procedure
Connecting the Core/Net backplanes
In Group 0 only, the Shelf 0 and Shelf 1 backplanes must be connected with two NT8D99AD cables (Core/Net modules only).
Procedure 39
Connecting the Core/Net backplanes
1Connect one NT8D99AD cable from the “E” port in Core/Net 0 to the “E” port in Core/Net 1.
2Connect a second NT8D99AD cable from the “D” port in Core/Net 0 to the
“D” port in Core/Net 1. See Figure 103 on page 242.
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning