Page 196 of 456 Cabling Common Equipment in a Single Group system

CAUTION

Loss of Data

Label all cables on both ends before installation. Labels help ensure that the cables are properly routed and connected. Cable labels also help installers to troubleshoot problems and replace equipment.

Procedure 24

Installing the CP PIV to I/O panel cables

1Connect COM1 on the CP PIV faceplate to J25 on the I/O panel with cable NT4N88AA.

2Connect COM2 on the CP PIV faceplate to J21 on the back of the I/O panel with cable NT4N88BA.

3Connect the Dual Ethernet Adapter (RJ-45) for I/O Panel (NTRE40AA) to J31. Secure the adapter to J31 with the two screws included in the shipment.

4Connect LAN 1 (Ethernet) on the CP PIV faceplate to J31 (top) of the I/O panel with cable NT4N90BA.

This connection can only be made after the Dual Ethernet Adapter is installed (see step 3 above).

Note: If a LAN switch is not used, connect LAN 1 in Core 0 to LAN 1 in Core 1.

5Connect a crossover Ethernet cable (NTRC17BA) from the LAN 2 port in Core 0 to the LAN 2 port Core 1. This connection is for Core redundancy.

Note: To ensure EMI shielding, route the cable along the front of the card cage and through the sides of the Core/Net modules.

6Repeat steps 1 through 4 in the second Core/Net module.

End of Procedure

NN43021-310 Standard 02.01 December 2007

Page 196
Image 196
Nortel Networks 1000M warranty Loss of Data, Procedure Installing the CP PIV to I/O panel cables