![](/images/new-backgrounds/1223061/22306173x1.webp)
64
Page 37 of 456
Preparing for installation
Contents
This section contains information on the following topics: |
|
Requirements | 37 |
System equipment – UEMs | 38 |
System options | 45 |
Cable routing guidelines | 54 |
Equipment handling precautions | 58 |
Preparing the equipment for installation | 62 |
Requirements
WARNING
Before a Large System can be installed, a network assessment must be performed and the network must be
If the minimum VoIP network requirements are not met, the system will not operate properly.
For information on the minimum VoIP network requirements and converging a data network with VoIP, refer to Converging the Data Network with VoIP
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning