Page 62 of 456 Preparing for installation

Preparing the equipment for installation

Use the equipment room floor plan to position equipment. See Communication Server 1000M and Meridian 1: Large System Planning and Engineering (NN43021-220) to prepare the equipment room and floor plan.

WARNING

A fully loaded column weighs 275 kg (606 lb). More than one person is required to remove equipment from shipping pallets.

WARNING

Module covers are not hinged; do not let go of the cover. Lift the cover away from the module and set it out of the work area.

Procedure 1

Preparing the equipment for installation

1Remove equipment from the shipping pallets; follow the unpacking instructions that come with the packaging material.

2Remove the front and rear covers from each module:

NN43021-310 Standard 02.01 December 2007

Page 62
Image 62
Nortel Networks 1000M warranty Procedure Preparing the equipment for installation