
Cabling Common Equipment in a Single Group system Page 201 of 456
a.Use the extraction tool to disconnect the NT4N29 cables from the Core backplane.
b.Connect the cables to the appropriate group (see Table 24).
Table 24
Fanout panel to 3PE card connectors
Group |
| Fanout Panel |
|
|
Number |
| connector |
| 3PE card connector |
|
|
|
|
|
0 | connects from | to | A | |
0 | connects from | to | B |
Note: Group 0 cables (NT4N29) connect the fanout panel directly to the network backplane of Core/Net 1.
Figure 81
3PE faceplate connections
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| NT8D80AZ cable |
|
|
|
|
|
|
|
|
|
|
|
| ||
Net |
|
|
|
|
|
|
|
|
|
|
| Core |
|
| Net |
|
|
|
|
|
|
|
|
|
|
| Core |
|
|
|
|
| NetworkSuperloopCard |
| NetworkSuperloopCard |
| NetworkSuperloopCard |
|
|
| SignalingPeripheralCard | cCNI | SYS | CP |
|
|
| NetworkSuperloopCard |
| NetworkSuperloopCard |
| NetworkSuperloopCard |
|
|
| SignalingPeripheralCard | cCNI | SYS | CP |
PS | CardConference/TDS |
|
|
|
|
| cardControllerCIock | UTIL | PIV | PS | CardConference/TDS |
|
|
|
|
| cardControllerCIock | UTIL | PIV | ||||||||||
|
|
|
|
| A |
|
|
|
|
|
|
| A |
|
| ||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
| B | Enb |
|
|
|
|
|
|
|
|
|
|
|
|
| B | Enb |
|
|
|
|
|
|
|
|
|
|
|
|
| Enb |
|
|
|
|
|
|
|
|
|
|
|
|
|
| Enb |
|
|
|
|
|
|
|
|
|
|
|
|
|
| Dis | Dis |
|
|
|
|
|
|
|
|
|
|
|
|
| Dis | Dis |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| INIT |
|
|
|
|
|
|
|
|
|
|
|
|
| INIT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| RESET |
|
|
|
|
|
|
|
|
|
|
|
|
| RESET |
|
| NT8D17 |
| NT8D04 |
| NT8D04 |
| NT8D04 |
|
| NTRB53 | QPC43R |
|
|
|
| NT8D17 |
| NT8D04 |
| NT8D04 |
| NT8D04 |
|
| NTRB53 | QPC43R |
|
|
|
PS | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 c9 c10 c11 c12 c13 c14 c15 CP | PS | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 c9 c10 c11 c12 c13 c14 c15 CP |
|
NT8D80AZ cable |
End of Procedure
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning