| Introduction Page 35 of 456 | |
|
|
|
| Table 2 |
|
| List of tasks in subsections |
|
|
|
|
| Task | Go to page |
|
|
|
| Preparing for installation | 37 |
|
|
|
| Placing the fourth module on a column | 65 |
|
|
|
| Positioning and leveling equipment | 71 |
|
|
|
| Installing overhead cable tray kits | 89 |
|
|
|
| Installing AC power | 77 |
|
|
|
| Installing DC power | 93 |
|
|
|
| Planning and designating a Main Distribution Frame | 133 |
|
|
|
| Installing Power Failure Transfer Units | 145 |
|
|
|
| Configuring the system monitor | 151 |
|
|
|
| Connecting a system terminal or modem | 171 |
|
|
|
| Cabling Common Equipment in a Single | 187 |
| Group system |
|
|
|
|
| Cabling Common Equipment in a Multi Group system | 207 |
|
|
|
| Cabling network modules and loops | 239 |
|
|
|
| Cabling lines and trunks | 261 |
|
|
|
| Powering up the system and initial loading | 299 |
|
|
|
| Performing acceptance tests | 335 |
|
|
|
| Installing earthquake bracing | 343 |
|
|
|
| Adding a module to a column | 363 |
|
|
|
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning