Preparing for installation Page 45 of 456

System options

The procedures in this document apply to the following system options:

Meridian 1 PBX 61C: dual CPU, full network group

Meridian 1 PBX 81C: dual CPU, multiple network groups

CS 1000M SG: a Meridian 1 PBX 61C system upgraded to include a Signaling Server (see note below)

CS 1000M MG: a Meridian 1 PBX 81C system upgraded to include a Signaling Server (see note below)

Note: For information about Signaling Server installation and

configuration, see Signaling Server: Installation and Commissioning (NN43001-312).

All system options are available in both AC- and DC-powered versions.

System architecture and module types are described in Communication Server 1000M and Meridian 1: Large System Overview (NN43021-110). The components of AC-powered systems, DC-powered systems, and reserve power options for both are described in this document.

Meridian 1 PBX 61C and CS 1000M SG

These systems feature a dual Pentium Processor with standby processing capability, fully redundant memory, and a full network group. Two Core/Net modules and one IPE module are the minimum installation requirements. Additional IPE modules and application modules can be used. The modules are stacked (see Figure 5 on page 46) or installed side-by-side (see Figure 6 on page 46).