
Page 392 of 456 Installing a Signaling Server
Procedure 73
Connecting a Nortel CP PM Signaling Server
Note: Refer to Figure 139 when performing the following procedure.
1Establish a maintenance terminal connection at the back of the shelf of the IPMG. The com (SDI) port of the CP PM circuit card Signaling Server is routed through the backplane of the shelf to the 50 pin MDF connector on the back of the shelf. A special cable is shipped with the CP PM signaling server that adapts the 50 pin MDF connector to a 25 pin DB connector (NTAK19EC). A
a.Connect the NTAK19EC cable (shipped with the CP PM Signaling Server) to the 50 pin MDF connector on the back of the desired shelf of the IPMG.
b.Connect a
2Insert the Signaling Server circuit card into an appropriate slot on the shelf of the IPMG. The CP PM Signaling Server is
3Connect the Signaling Server to the TLAN subnet. Insert the
4Connect the Signaling Server to the ELAN subnet. Insert the