Page 108 of 456 Installing DC power

3Cabling and connecting — Basic rules, specifications for connecting lugs, torque values for bolted lug to bus bar connections, cabling layouts, and procedures for cabling and connecting the ground leads, AC supplies for the rectifiers, DC load cables, miscellaneous cables, and final connections at the batteries.

4Startup and adjustment procedures — Installation of the rectifiers in the power shelves and initial startup, testing, and adjustment of the power system. Candeo SP 48300 power systems make use of a microprocessor-based controller, which controls the settings for the rectifiers. There are no hardware-based adjustments for the System Manager SP, but there are other configuration steps required. Refer to the chapter “Configuring and operating the system” in the user manual (P7000154).

5End of job routines and turnover — End-of-job routines include designating frame numbers, rectifiers, and distribution circuits, and touching up damaged and/or scratched painted surfaces, then turning over the system to the customer.

Configuration reference guide

The Candeo system is easy to configure. For detailed instructions, refer to Candeo Power System User manual UC6C75 (P0914425) for the Large Candeo system, or Candeo SP 48300 Power System AP6C55AA User Manual (P7000154) for the Small Candeo system. The installation manuals cover the following topics.

Large Candeo

1Overview of the Candeo Power System

2System Description and Specifications

3System Engineering

4Configuring and Operating the Candeo Power System

5Maintenance

6Troubleshooting

7Replacement Parts

NN43021-310 Standard 02.01 December 2007

Page 108
Image 108
Nortel Networks 1000M warranty Configuration reference guide