UPS grounding diagram
Signaling Server
Standard two-feed wiring
AC reserve power configuration
COM Init Reset
Modem Commands Effect
Cable connector
Top cap assembly
List of Procedures
Page 457
Image 457
Page 456
Page 458
Page 457
Image 457
Page 456
Page 458
Contents
Communication Server 1000M and Meridian
Large System Installation and Commissioning
Page
Contents
Introduction
Installing DC power
Connecting a system terminal or modem 171
Cabling Common Equipment in a Multi Group system
Cabling lines and trunks 261
Adding a module to a column
10 of 456 Contents
New in this release
Features
Other
Revision History
August
April
September
October
List of Procedures
NN43021-310 Standard 02.01 December
Page
NN43021-310 Standard 02.01 December
Page
NN43021-310 Standard 02.01 December
Getting help from the Nortel Web site
How to get help
Getting help through a Nortel distributor or reseller
Finding the latest updates on the Nortel web site
Page
Subject
System information
Applicable systems
System migration
Intended audience
NTP feedback
Conventions
NTPs
Related information
Other documentation
CD-ROM
Page
Introduction
Contents
Overview
32 of 456 Introduction
Summary of procedures
34 of 456 Introduction
Introduction Page 35
36 of 456 Introduction
Requirements
Preparing for installation
UEMs are stacked in columns
System equipment UEMs
Universal Equipment Modules
Top caps
Modules
Columns are grouped in rows
Example of Large System column row
UEMs are identified by function
UEMs identified by function
Card cage
Core/Net module
NT4N41 Core/Net shelf fanout panel backplane
Meridian 1 PBX 61C and CS 1000M SG
System options
Meridian 1 PBX 61C side-by-side configuration
Meridian 1 PBX 61C stacked configuration
Four-tier multi-group system
Meridian 1 PBX 81C and CS 1000M MG
Three-tier multi-group system
CP PIV
New system types
CP PIV call processor card side
Media
COM Init Reset
Signaling Server
CS 1000M Large System
Engineering rules
Cable routing guidelines
Cable routing troughs front view of module
Top view of front to I/O connector panel routing
Damage to Equipment
Cable connector
Unloading equipment
Equipment handling precautions
Handling circuit cards
Working with power supplies
Comply with all Warnings
Static discharge points
DenAn regulatory notice for Japan
Procedure Preparing the equipment for installation
Preparing the equipment for installation
Locking latches on the module cover
Removing the pedestal grill
End of Procedure
Placing the fourth module on a column
Placing the fourth module on a column
System Failure
Procedure Placing the fourth module on a column
Module positioning guides
Module mounting bolts
Power and system monitor connections
Page
Positioning and leveling equipment
Procedure Positioning and leveling the equipment
Positioning and leveling the equipment
Page
Positioning spacer gaskets
Gasket placement Rear Front
Spacer positioning
Column positioning with spacers
Page
AC-powered systems
Installing AC power
Safety ground/protective earth and logic return wiring
Large System
Single column ground and logic return distribution
Large System
Multiple column ground and logic return distribution
Installing AC power Page 81
82 of 456 Installing AC power
AC column ground lug daisy chain connection
PDU ground lug locations
Logic return connection for each column
553-8996
AC reserve power configuration
Installing UPS ground cabling
UPS
Bypass switch frame grounds
UPS grounding diagram
Service panel
Column frame grounds
Page
Installing overhead cable tray kits
Installing overhead cable tray kits
Removing top cap grills
Procedure Installing the overhead cable tray kits
Overhead cable tray kit
Page
DC-powered systems
Installing DC power
Candeo DC power systems
Installing DC power Page 95
96 of 456 Installing DC power
Rectifier 50/48 Module
Large Candeo modules
System Manager Module
Installing DC power Page 99
Example configuration #1
Rectifier 30/48
Small Candeo modules
System Manager SP
Distribution 300 panel
Basic 120 a Small Candeo configuration
Installing DC power Page 105
Installation reference guide
Large Candeo
Configuration reference guide
Safety ground/protective earth and logic return wiring
Maintain the integrity of the frame or safety ground
Cabling and connecting the grounding leads
Follow local requirements and electrical code
Installing DC power Page 111
112 of 456 Installing DC power
Then
Candeo power system framework
Connection of the frame ground lead inside the frame
116 of 456 Installing DC power
Four-Feed PDU
Standard two-feed wiring
Optional four-feed wiring
NT4N49AA PDU
PDU circuit protection Source
120 of 456 Installing DC power
+ + Lrtn
DC-power equipment in the rear of the pedestal NT4N49AA PDU
Cable routing in the rear of the pedestal NT4N49AA PDU
Installing safety ground/protective earth wiring
Installing the Four-Feed PDU
Procedure Installing safety ground/protective earth wiring
To ground/protective
Connecting power from the power plant to the PDU
Page
Page
PDU to Large Candeo connections
Procedure Connecting UK power to the Four-Feed PDU
Connecting UK power to the Four-Feed PDU
System monitor connections
Master Power Cabinets
UEM to 8B/2R or 8B/4R master power cabinet connections
TB1 in Power distribution unit
Positive Bus
Page
Planning and designating a Main Distribution Frame
Installation and designation
About terminations
Terminal block requirements
Installing the BIX cross-connect terminal
End of Procedure Typical BIX cross-connect terminal layout
Procedure Installing the BIX cross-connect terminal
BIX module
Recommended layout for NT8D37 IPE Modules
Procedure Installing the Krone Test Jack Frame UK
Installing the Krone cross-connect system UK
IPE module card allocation Krone cross-connect system
CE/PE module card allocation Krone cross-connect system
Labels
Label for Analog Line Card
Through to show labels for the Krone cross-connect system
Safety Warning
Label for Digital Line Card NT8D02
Label for Power Failure Transfer Unit
Label for Direct Dial Inward Trunk Card NT5K17
Label for Exchange Line Trunk Card NT5K18
Pftu configurations
Installing Power Failure Transfer Units
IPE
MDF terminations for typical Pftu operation
Lfben
Procedure Installing a Pftu
Installing a Pftu
Procedure Connecting trunks and telephones
Connecting trunks and telephones
Installing QUA6 PFTUs
System monitor cabling
Configuring the system monitor
Multi-column systems
AC power control
Power failure transfer control
DC power observation
System monitor to system monitor serial link cabling
Procedure Configuring the System Monitor NT8D22
Configuring the System Monitor
NT8D22 switch settings for a single-column system Switch
Switch settings for slaves in multiple-column system
Switch settings for master in multiple-column system
Configuring the system monitor Page 155
156 of 456 Configuring the system monitor
Cabling the System Monitor
Off End of Procedure
System monitor module-to-module cabling
Procedure Cabling the System Monitor NT8D22
To next module
160 of 456 Configuring the system monitor
Multiple-column system monitor connections
BL/W Remalma
AC fail to UPS
UPS alarm cabling
Alarm interfacing to Candeo
166 of 456 Configuring the system monitor
Alarm
Alarm configuration NT8D46xx Candeo Label Colour
Configuring the alarm ports
Configuration
Cabling the Candeo
Procedure Configuring the alarm ports
Customizing alarms
Page
About the system terminal
Connecting a system terminal or modem
Terminal connection diagram
Terminal guidelines
Connecting a terminal
Procedure Connecting a terminal to a COM port
Connecting a terminal to a COM port
One terminal for the COM1 ports
Connecting a switch box and terminal to COM1 and COM2 ports
Network Module
Connecting a switch box and terminal to SDI and COM1 ports
One terminal and a switch box to the SDI and COM1 ports
Connecting a modem
Modem guidelines
Procedure Configuring a modem
Configuring a modem
Modem Commands Effect
Connecting a modem to an SDI port
Procedure Connecting a modem to an SDI port
End of Procedure
Modem to SDI port
Connecting a modem to switch box, COM2 ports, SDI ports
End of Procedure
Connecting a system terminal or modem Page 185
186 of 456 Connecting a system terminal or modem
Cabling guidelines
Cabling Common Equipment in a Single Group system
188 of 456 Cabling Common Equipment in a Single Group system
Core backplane
Core/Net module
Stacked configuration of Core/Net modules
Reviewing Core/Net module placement
Side-by-side configuration of Core/Net modules
Reviewing required Core cards
Checking that the Core cards front side are installed
NTRC17BA
Cabling the Core side
Core/Net cable connections top view
CP PIV Core and Network backplanes
Cabling the I/O panel
Loss of Data
Procedure Installing the CP PIV to I/O panel cables
Required Net side cards Quantity Order Code Description
Cabling the Network side
Required Net side cables Quantity Order Code Description
CP PIV Core/Net Module slot
Configuring and cabling the Clock Controllers
Procedure Connecting the Clock Controller cables
Connecting the 3PE faceplates in the Core/Net modules
Network Group 0 Shelf 0 to Shelf
Procedure Inspecting NT4N29AA factory installed cables
Inspecting CNI to 3PE factory installed cables
NT8D80AZ cable
3PE faceplate connections
Procedure Connecting the Core/Net backplanes
Connecting the Core/Net backplanes
Optioning the System Utility Card
System Utility Card DIP switch settings Core/Net
Core side of Core/Net module
Connecting Core modules to a LAN
CP PIV to I/O panel connections
Procedure Connecting the Core module to a LAN
Front of module
Options for LAN 1 connections
Cabling Common Equipment in a Multi Group system
208 of 456 Cabling Common Equipment in a Multi Group system
Cabling Common Equipment in a Multi Group system Page 209
210 of 456 Cabling Common Equipment in a Multi Group system
Module IPE
Side-by-side placement of CP PIV Core/Net modules
Cabling the Core/Net module backplane
Checking Core card front side installation
Procedure Cabling the Core/Net module backplane
Disconnecting cables from the Core/Net module backplane
Procedure Disconnecting cable connectors from the backplane
Cabling Common Equipment in a Multi Group system Page 215
Core shelf cabling
Core card placement in the NT4N41 Core/Net Module front
Required Core cables
Card placement in the NT4N41Core/Net Module
218 of 456 Cabling Common Equipment in a Multi Group system
Cabling Common Equipment in a Multi Group system Page 219
Installing the CP PIV to I/O panel cables
On page 222 displays the COM and LAN cable connections
Panel connections
Core
Connecting the Core module to a LAN
Cabling a Dual Ring Fiber Network
Dual Ring Fiber Network
Required cables
Required cards
NTRC46BB
Class 1 LED Device
Fiji card cabling
Fiji card faceplate
Optical Cable Management Card Ocmc
Ocmc the Optical Cable Management Card
Procedure Installing the Shelf 0 fiber optic ring ascending
Installing the Shelf 0 fiber optic ring ascending
Procedure Installing the Shelf 1 fiber optic ring
Installing the Shelf 1 fiber optic ring descending
Shelf 0 fiber optic ring on a 4 group machine
Shelf 1 fiber optic ring on a 4 group machine
Cabling Common Equipment in a Multi Group system Page 233
Fiji to Fiji cabling
Procedure Connecting the Fiji to Fiji cables
Connecting the Clock Controller cables
Group Shelf
Clock Controller placement
End of Procedure
Fiji card
Clock Controller cable configuration
Network-to-network cabling
Cabling network modules and loops
Network module connections
NT8D80AZ cable Net Core
3PE faceplate connection between the Core/Net modules
Network Group 0 Shelf 0 to Shelf 1 backplane connections
Connecting Groups 1 through 7 Shelf 0 to Shelf
Procedure Connecting Groups 1 through 7 Shelf 0 to Shelf
Network backplane Shelf NT8D99AB cable
3PE Fanout panel in the Core/Net module top view
Connecting the Network modules to the Core/Net modules
3PE termination panel
Core/Net backplane rear view
NTND14 to 3PE cables
3PE Fanout panel rear module view
CCNI slot and port assignments
Fanout panel Core/Net module
CCNI to 3PE Fanout panel cable connections
Network Group 1, shelf
Connecting the 3PE cables to the 3PE fanout panels
251
Cabling a Superloop Network Card single column
Procedure Basic cabling for single-row network connections
253
From
NT8D04 network loop configurations
255
Cabling a Superloop Network Card multiple columns
Procedure Basic cabling for multiple-row network connections
SL0 to J2 SL1 to J3 SL2 to J4 SL3 to J5
258 of 456 Cabling network modules and loops
End of Procedure Installing a superloop adapter plate
259
260 of 456 Cabling network modules and loops
Cabling lines and trunks
NT8D37 backplane cable designations
Media Gateway cabling requirements
Cabling an IPE Module or Media Gateway
Procedure Cabling an IPE Module NT8D37 or Media Gateway
NT8D37 IPE Module I/O panels
Procedure Connecting lines and trunks
Connecting lines and trunks
O-W
BR/BR-V
NT8D37 IPE Module line card pair-terminations Part 2 Unit
Pair color Unit
Paging Other Pin Mode
Pin numbers Pair color Unit
TA/TB
BK-G/G-BK RA/RB
BK-O/O-BK TA/TB
BL-W
DDI Mode Pins Color Number
BL-BK BK-S BK-G
BL-V
278 of 456 Cabling lines and trunks
COT
Pins Color Number
280 of 456 Cabling lines and trunks
BK-BR BR-BK
282 of 456 Cabling lines and trunks
Cabling lines and trunks Page 283
284 of 456 Cabling lines and trunks
BR-BK BK-S
Panel connectors Unit
286 of 456 Cabling lines and trunks
Cabling lines and trunks Page 287
BL-O BK-BR
Cabling lines and trunks Page 289
290 of 456 Cabling lines and trunks
BL-W SIG B SIG a BR-W
BL-V SIG B SIG a BR-V
Cabling lines and trunks Page 293
Type 1 mode Pins Color Number
Cabling lines and trunks Page 295
296 of 456 Cabling lines and trunks
Cabling lines and trunks Page 297
298 of 456 Cabling lines and trunks
Installing the Security Device
Powering up the system and initial loading
Procedure Installing the Security Device
Security Device
Connecting the AC power source
Preparing to power up AC
Procedure Preparing to power up AC
Procedure Turning AC power on
Turning AC power on
Procedure Resetting the main circuit breakers AC power
Resetting the main circuit breakers AC power
End of Procedure
Turning DC power on
Preparing to power up DC
Procedure Preparing to power up DC
Procedure Turning DC power on
Software installation
Installing software
Before you begin
Procedure Installing the software
NN43021-310 Standard 02.01 December
Powering up the system and initial loading Page 311
FAT
Powering up the system and initial loading Page 313
314 of 456 Powering up the system and initial loading
I N M E N U
Following keycode files are available on
Page
Install M E N U
Page
320 of 456 Powering up the system and initial loading
Page
Database
Page
SDL Installation Menu
Powering up the system and initial loading Page 325
NN43021-310 Standard 02.01 December
Yes From default floppy disk Option
Install M E N U
Do not Reboot Using Button
Procedure Testing Core/Net
Testing Core/Net 1 and Core/Net
Dspl ALL
Procedure Switching call processing
Switch call processing
Stat CPU Get status of CPU and memory
Stat XSM Check the system monitors Exit program
Acceptance tests
Performing acceptance tests
Procedure Testing module power supply
Testing the module power supply
Procedure Testing blower unit and thermal sensor
Testing the blower unit and thermal sensor
End of Procedure
Procedure Sysload test
Testing the sysload
Blower unit removal
Procedure Testing system terminal and system monitor
Testing the system terminal and system monitor
Procedure Testing the Pftu and its interface
Testing the Pftu
=,.?
342 of 456 Performing acceptance tests
Seismic-approved applications
Installing earthquake bracing
Installing seismic bracing
Selecting the kit
Seismic Bracing Kits System configuration
Concrete Light Anchor Kit
Seismic Anchor Kit
Thk min
Drilling concrete floors
Anchor hole sizes Kit Order Code Hole diameter Hole depth
Procedure Drilling concrete floors
Procedure Installing Kit a
Installing Kit a and Kit B anchor plates
Mounting plate installation
Procedure Installing Kit B
Installing earthquake rods
Exhaust grill removal
Procedure Installing earthquake rods
Top cap assembly
Page
Installing bracing rods for column support
Gasket placement Rear Front
Positioning and leveling the system
Procedure Leveling the system
Adding spacers to columns
Installing non-seismic bracing
Procedure Installing a Floor Mounting Kit NT8D64BF
Installing a non-seismic anchor kit
End of Procedure
Pedestal mounting flange rear view
Page
Adding a module to a column
Adding a module to the base of a column
DIS TTY
Procedure Adding a module to the base of a column
366 of 456 Adding a module to a column
Adding a module to a column Page 367
Exit LD
ENL TTY
Module-to-module power and system monitor connections
Adding a module between two other modules
Procedure Adding a module between two other modules
Module mounting bolt
Module positioning guides
ENL TTY
Adding a module to the top of a column
Procedure Adding a module to the top of the column
Air exhaust grill removal
Orange power connector removal tab locations
UK air exhaust grill removal
UEM
Adding a module to a column Page 377
Module positioning guides
Adding a module to a column Page 379
380 of 456 Adding a module to a column
Monitor cable J2 backplane alignment tab and key alignment
Cable well location
ENL TTY
Installing a Signaling Server
Introduction
Readiness checklist
For a CS 1000E Nortel CP PM Signaling Server NTDW61BAE5
Readiness checklist Part 1 Have you
Readiness checklist Part 2 Have you
Installing the CP PM Signaling Server hardware
Installation in a CS 1000E system
Connecting a Nortel CP PM Signaling Server
Connection checklist
Connections checklist Have you
Connections
390 of 456 Installing a Signaling Server
Faceplates of the Nortel CP PM server
Procedure Connecting a Nortel CP PM Signaling Server
End of Procedure
End of Procedure
Verify or change the baud rate
Connecting an IBM X306m Signaling Server
396 of 456 Installing a Signaling Server
HP DL320-G4 Signaling Server rear view
Connecting an HP DL320-G4 Signaling Server
Procedure Connecting an HP DL320-G4 Signaling Server
Maintenance terminal configuration parameters
Introduction
Installing the Signaling Server software
Procedure Installing Signaling Server software
Installing the software
Nortel CP PM system Bios configuration
VxWorks system banner
Nortel Networks
Install Tool banner screen
File systems verification failure
Date and time
System Information
System Summary
Install Tool Main Menu
Dependency lists installation
Installation Status
Software installation success
Installation output
Voice Gateway Media Card loadware
IP Phone firmware
Done copying IP configuration to disk
Restore IP configuration
IP telephony parameter confirmation
Signaling Server role selection
Application configuration
Follower Signaling Server configuration
Network Routing Service NRS co-resident Signaling Server
Network Routing Service NRS stand-alone Signaling Server
NRS type stand-alone Signaling Server
NRS type co-resident Signaling Server
Leader Signaling Server configuration
Installing a Signaling Server Page 419
Stand-alone Signaling Server configuration
Alternate NRS IP address
Primary NRS IP address
IP Telephony parameter configuration
Page
Installation Status Summary
Enter Choice q
Quit
First boot of a new Nortel CP PM Signaling Server
Entering basic system parameters
Procedure Entering basic system configuration parameters
CP PM board location
Leader/Follower Signaling Server configuration
430 of 456 Installing a Signaling Server
Application configuration
Standalone Signaling Server NRS
Installing a Signaling Server Page 433
434 of 456 Installing a Signaling Server
Installing a Signaling Server Page 435
436 of 456 Installing a Signaling Server
IP Telephony parameter configuration
For future reference, the Elan MAC address is 0002b3c55lc6
Install tool
Installation Tool quit confirmation
Adding a follower Signaling Server
Installing a Signaling Server Page 441
Node Configuration web
Edit web
Signaling Server properties template
Unpacking Help files for Virtual Terminal Emulator
Logging in to the Signaling Server
Procedure Logging in to the Signaling Server
Testing the Leader Signaling Server
Verifying a successful configuration
Page
Numerics
Index
450 of 456 Index
Index Page 451
452 of 456 Index
Index Page 453
454 of 456 Index
Index Page 455
456 of 456 Index
Page
Communication Server 1000M and Meridian
Large System Installation Commissioning
Top
Page
Image
Contents