
Index Page 451 of 456
F
field wiring kits and terminals PDU connections, 121
floor drilling for anchor bolts, 347
floor plans, 62
fourth modules, 65
G
gaskets
bracing rod installation, 356 spacer kits, 72
GFCI (ground fault circuit interrupt) devices, 77
global PDU, 94
grills, 63
ground/protective earth AC power, 78, 82 DC power, 109, 123 UPS, 85
ground start feature, 149
I
IG (isolated ground) bus, 78
installing
QUA6 PFTU (UK), 150
insulated ground wire, 124
I/O panels
backplane connections, 262, 263 IPE module connections, 265 superloop cabling, 257, 259, 260 system terminal connections, 171
IPE modules backplane slots, 138
cable connections, 261, 265 line
superloop cabling, 252, 256
trunk
K
Krone cross connect system (UK), 138
L
labels
Krone cross connect system, 140
ladder racks, 89
LD 37 program
module additions, 365, 368, 370, 373, 374, 382 system terminal tests, 340
LED
leveling
earthquake bracing, 357 equipment, 71
lines
cabling, 261 connecting, 266
line transfer switches, 341
locking latches, 63
logic return wiring AC power, 78, 82 DC power, 109
LRE (logic return equalizers), 79, 84
M
master switch settings, system monitor, 154
MDF (modular distribution frames), 133 backplane cable expansion, 138 I/O panel connections, 263 PFTU
system monitor cabling, 161
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning