
144
Page 133 of 456
Planning and designating a
Main Distribution Frame
Contents
This section contains information on the following topics:
About terminations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133
Installation and designation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133
Terminal block requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 134
Installing the BIX
Installing the Krone
About terminations
All Large System terminations are
DANGER OF ELECTRIC SHOCK
Tip, ring, A, B, E, M, ESC, and ESCG connections can be considered to be Telecommunication Network Voltages (TNV).
Installation and designation
Refer to the manufacturer's documentation for recommendations and detailed procedures on installing and labelling the
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning