Installing DC power Page 131 of 456
Figure 47
UEM to 8B/2R or 8B/4R master power cabinet connections
To Test Jack Frame (TJF) | Master Power Cabinet(s) | |
16 sq mm green/yellow | ||
| ||
| Positive Bus | |
Black wires |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Factory installed | |||
Orange wire |
| (16 sq mm | ||||||
| green/yellow) | |||||||
(10 sq mm) |
|
|
|
|
| |||
| Logic Return Equalizer, |
|
|
|
|
| ||
| LRE (functional earth) |
| Alarm terminal | |||||
|
|
|
|
| ||||
|
|
|
|
|
| (3 off) | ||
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
Each output is rated at 30 A maximum. Maximum total output is 150 A.
J4 in system monitor (XSM)
|
| Red wires | Power alarm cable |
|
| ||||||
|
| (NT8D46AV) |
|
| |||||||
|
|
|
|
|
|
|
| ||||
TB1 in Power distribution unit | |||||||||||
| To CB4 (blower) |
|
|
|
|
|
| ||||
| CB0 (module 0), |
|
|
|
|
|
| ||||
& CB1 (module 1) |
| To connections | |||||||||
|
|
| To CB2 (module 2) |
| in pedestal | ||||||
|
|
| |||||||||
|
|
|
|
|
|
|
|
| |||
|
|
| & CB3 (module 3) |
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- BAT | - BAT |
0 | 1 |
- BAT
2
- BAT + RTN
3 | 0 |
+ RTN + RTN + RTN LRTN
1 | 2 | 3 |
Note: Optional |
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning