
Page 4 of 456 Contents |
|
Introduction | 31 |
Contents | 31 |
Overview | 31 |
Summary of procedures | 33 |
Preparing for installation | 37 |
Contents | 37 |
Requirements | 37 |
System equipment – UEMs | 38 |
System options | 45 |
Cable routing guidelines | 54 |
Equipment handling precautions | 58 |
Preparing the equipment for installation | 62 |
Placing the fourth module on a column | 65 |
Contents | 65 |
Overview | 65 |
Placing the fourth module on a column | 65 |
Positioning and leveling equipment | 71 |
Contents | 71 |
Positioning and leveling the equipment | 71 |
Installing AC power | 77 |
Contents | 77 |
77 | |
Safety ground/protective earth and logic return wiring | 78 |
Installing safety ground/protective earth and logic return wiring | 82 |
Installing UPS ground cabling | 85 |
Installing overhead cable tray kits | 89 |
Contents | 89 |