Cabling Common Equipment in a Single Group system Page 199 of 456

Procedure 25

Connecting the Clock Controller cables

See Figure 84 on page 205.

1Connect P1 of the NT8D75 cable to port J3 of Clock Controller 0.

2Connect P2 of the NT8D75 cable to port J3 of Clock Controller 1.

End of Procedure

Network Group 0: Shelf 0 to Shelf 1

Each Single Group System contains one Network group, Group 0. Each Network group is comprised of two Network shelves: Shelf 0 and Shelf 1.

The Core/Net modules contain Network Group 0. Shelf 0 is in Core/Net 0, Shelf 1 is in Core/Net 1. Shelf 0 must be connected to Shelf 1 for Network Group 0 to operate correctly.

This section contains instructions on:

1“Connecting the 3PE faceplates in the Core/Net modules” on page 199

2“Inspecting CNI to 3PE factory installed cables” on page 200

3“Connecting the Core/Net backplanes” on page 202

Connecting the 3PE faceplates in the Core/Net modules

The 3PE cards in the Core/Net modules must be directly connected with an NT8D80 cable. See Figure 81 on page 201. This connection is only made between the Group 0 shelves in the Core/Net modules.

Communication Server 1000M and Meridian 1 Large System Installation and Commissioning

Page 199
Image 199
Nortel Networks 1000M warranty Network Group 0 Shelf 0 to Shelf, Connecting the 3PE faceplates in the Core/Net modules