Powering up the system and initial loading Page 303 of 456

Procedure 50

Option 2: Hard-wiring the power connections (optional)

Instead of using the power-plug, each column can be hard-wired to the service panel.

1Route one of each green, white, and black #10 AWG wires through

20 mm (3/4 in.) conduit from the service panel to each Large System column.

2At the column, connect the wires to the field wiring access block of the PDU according to the following:

GND (ground) to the green wire

L2 (neutral) to the white wire

L1(hot) to the black wire

3Connect the wires to the hot, neutral, and ground connections at the service panel.

4Proceed to “Turning AC power ON” on page 303.

End of Procedure

Turning AC power ON

Follow Procedure 51 and Procedure 52 to prepare to power up a Large

System.

CAUTION

System Failure

If a problem occurs when a step is performed, resolve that problem before continuing.

Procedure 51

Turning AC power on

1In the AC power panel, set the circuit breaker for Column 0 to ON.

2Set the main circuit breaker for Column 0 to ON (rear of the pedestal).