Installing a Signaling Server Page 389 of 456

Connections

Connection checklist

WARNING

Do not modify or use a supplied AC power cord if it is not the correct type required for the host region.

IMPORTANT!

Nortel CP PM servers are powered through the backplane of the Media Gateway, Universal Equipment Module or 11C cabinet into which they are installed and thus require no power cord.

Before connecting a Signaling Server, ensure that you have the following materials on-hand.

Table 65

Connections checklist

Have you:

Obtained a serial cable (DTE-DTE null modem cable) to connect the server to a maintenance terminal?

Obtained the NTAK19EC cable (if you are connecting a Nortel CP PM server)? This cable adapts the 50-pin MDF connector on the back of the shelf of the Media Gateway, Universal Equipment Module, or 11C cabinet to a 25-pin DB connector.

Obtained the CAT5 cables (or better) to connect the server to the ELAN and TLAN subnets?

Connecting a Nortel CP PM Signaling Server

This section contains instructions for connecting the NTDW61BAE5 CP PM Signaling Server to the ELAN and TLAN subnets of a CS 1000E and

Communication Server 1000M and Meridian 1 Large System Installation and Commissioning

Page 389
Image 389
Nortel Networks 1000M warranty Connections, Connection checklist, Connecting a Nortel CP PM Signaling Server