Performing acceptance tests
Contents
This section contains information on the following topics:
Acceptance tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 335
Testing the module power supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 336
Testing the blower unit and thermal sensor . . . . . . . . . . . . . . . . . . . . . 337
Testing the sysload . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 339
Testing the system terminal and system monitor . . . . . . . . . . . . . . . . . 340
Testing the PFTU . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 341
Acceptance tests
CAUTION
Ensure that the current DEP Lists are installed.
Perform the following acceptance tests after the system loading is completed.
1“Testing the module power supply” on page 336
2“Testing the blower unit and thermal sensor” on page 337
3“Testing the sysload” on page 339
4“Testing the system terminal and system monitor” on page 340
5“Testing the PFTU” on page 341