Performing acceptance tests

Contents

This section contains information on the following topics:

Acceptance tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 335

Testing the module power supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 336

Testing the blower unit and thermal sensor . . . . . . . . . . . . . . . . . . . . . 337

Testing the sysload . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 339

Testing the system terminal and system monitor . . . . . . . . . . . . . . . . . 340

Testing the PFTU . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 341

Acceptance tests

CAUTION

Ensure that the current DEP Lists are installed.

Perform the following acceptance tests after the system loading is completed.

1“Testing the module power supply” on page 336

2“Testing the blower unit and thermal sensor” on page 337

3“Testing the sysload” on page 339

4“Testing the system terminal and system monitor” on page 340

5“Testing the PFTU” on page 341

Communication Server 1000M and Meridian 1 Large System Installation and Commissioning

Page 335
Image 335
Nortel Networks 1000M warranty Performing acceptance tests, Acceptance tests