362

Page 343 of 456

Installing earthquake bracing

Contents

This section contains information on the following topics:

Seismic-approved applications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 343

Installing seismic bracing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 344

Drilling concrete floors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 347

Installing Kit A and Kit B anchor plates . . . . . . . . . . . . . . . . . . . . . . . . 349

Installing earthquake rods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 351

Positioning and leveling the system . . . . . . . . . . . . . . . . . . . . . . . . . . . 357

Installing non-seismic bracing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 358

Installing a non-seismic anchor kit . . . . . . . . . . . . . . . . . . . . . . . . . . . . 359

Seismic-approved applications

Depending on the geographic location, the floor installation method may or may not require seismic bracing. To meet seismic bracing requirements, the installation must meet the Bellcore or the California OSHPD installation specifications. In locations that do not have earthquakes, a non-seismic installation is acceptable.

In certain seismic-approved applications where the pedestal attachment to the floor may be required but Nortel does not offer the appropriate hardware, the installation organization must contact a seismic engineering firm to install the pedestal that meets Bellcore or California OSHPD requirements. This application could include attachment to a raised wood or steel floor.

Communication Server 1000M and Meridian 1 Large System Installation and Commissioning

Page 343
Image 343
Nortel Networks 1000M warranty Installing earthquake bracing, Seismic-approved applications