Cabling network modules and loops | Page 243 of 456 |
|
|
This connection is NOT made for Network Group 0 in the Core/Net modules.
Procedure 40
Connecting Groups 1 through 7: Shelf 0 to Shelf 1
1Connect an NT8D99AB cable from the A connector in Shelf 0 of Network Group 1 to the A connector in Shelf 1 Network Group 1.
2Connect the B connector in Shelf 0 to the B connector in Shelf 1.
3Connect the C connector in Shelf 0 to the C connector in Shelf 1.
4Connect the D connector in Shelf 0 to the D connector in Shelf 1.
5Connect the E connector in Shelf 0 to the E connector in Shelf 1.
6Connect the A, B, C, D, and E connectors between Shelf 0 and Shelf 1 for all other Network groups in the system (except Group 0)
Note: All connections are made with an NT8D99AB cable.
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning