Nortel Networks 1000M warranty Procedure Installing earthquake rods, Exhaust grill removal

Models: 1000M

1 458
Download 458 pages 7.95 Kb
Page 352
Image 352

Page 352 of 456 Installing earthquake bracing

Procedure 67

Installing earthquake rods

1Remove the top cap on each column:

a.Pull forward on the clips underneath the front edge of each air exhaust grill on the top cap. Lift up and remove the grill as illustrated in Figure 119.

Figure 119

Exhaust grill removal

Top cap

Air exhaust grill

Air exhaust grill

Module Clips

553-5886

b.Use a 8 mm (5/16 in.) socket wrench to remove the six screws that secure the top cap (see Figure 120 on page 353). Lift the top cap from the column.

NN43021-310 Standard 02.01 December 2007

Page 352
Image 352
Nortel Networks 1000M warranty Procedure Installing earthquake rods, Exhaust grill removal