DEFINITY Enterprise Communications Server Release 6

Issue 5

Installation and Test for Multi-Carrier Cabinets 555-230-112

May 1998

2 Install Telecommunications Cabling

 

 

Patch Cord/Jumper Installation and Administration

Page 2-47

 

 

 

 

 

 

 

 

crdf5pr CJL 103096

Figure Notes:

1.Equipment Room

2.Satellite Location

3.Work Location

4.White Row on 110 Terminal Block

5.Purple Row on 110 Terminal Block

6.Blue Row on 110 Terminal Block

7.Central Location for Terminals 1 through 6

8.D-Inside Wire Cut Down to Connecting Block

9.258A Adapter

10.Information Outlet

11.Voice Terminal

12.To Port Connector on Cabinet (Cabinet 1, Carrier A, Slot 03)

Figure 2-26. Example 3-Pair Labeling to Information Outlet

The satellite symbol must be installed at all connection points between the blue field and the information outlet. It must also be installed at the information outlet itself.

Page 100
Image 100
Lucent Technologies Release 6 manual Example 3-Pair Labeling to Information Outlet