DEFINITY Enterprise Communications Server Release 6 | Issue 5 | |||
Installation and Test for | May 1998 | |||
Contents |
|
| ||
|
|
|
| Page iv |
|
|
|
|
|
| ■ | Install Equipment and Cables | ||
| ■ | Install Cable Slack Managers | ||
| ■ |
| Install Sneak Fuse Panels | |
| ■ |
| Cable Installation | |
| ■ |
| Install Coupled Bonding Conductor | |
| ■ | Station Wiring Design | ||
| ■ | Station Circuit Distribution from Equipment Room | ||
| ■ | Layout | ||
| ■ |
| Voice and Data Terminals | |
| ■ |
| Label the Main Distribution Frame | |
| ■ |
| Patch Cord/Jumper Installation and Administration | |
| ■ | Create a Provisioning Plan | ||
3Install Management Terminal and
| Activate System | |||
|
| ■ | Install Management Terminal | |
|
| ■ | Activate the System | |
|
| ■ | Screens and Commands | |
|
| ■ | System Administration | |
|
| ■ | Set Country Options | |
|
| ■ | Circuit Pack Administration | |
|
| ■ | Set System Maintenance Parameters | |
|
| ■ | Administer System Configurations (Release 6r) | |
|
| ■ | Administer Fiber Links (Release 6r Only) | |
|
| ■ | Reboot High Reliability System | |
|
| ■ | Administer Attendant Console | |
|
| ■ | Save Translations | |
|
| ■ | Add Translations | |
|
| ■ | Installation Completion | |
|
| ■ | DEFINITY AUDIX Power Procedures | |
4 | Test the System | |||
|
| ■ | Check System Status for Each Cabinet | |
|
| ■ | Check Circuit Pack Configuration | |
|
| ■ | Test TDM Bus in PPN | |
|
| ■ | Test | |
|
| ■ | Test SPE Duplication Memory Shadowing Link | |