
DEFINITY Enterprise Communications Server Release 6 | Issue 5 |
Installation and Test for | May 1998 |
4 Test the System |
|
Check Circuit Pack Configuration | Page |
|
|
Check Circuit Pack Configuration
1.Verify the screen displays: Command:
2.Type list configuration all and press Enter.
3.Verify the screen displays list configuration screens similar to the example shown below. Check the report on the screen with the equipment installed and make sure the software is communicating with each circuit pack (except power supply circuit packs). Wait until after the diagnostic tests later in this chapter before attempting to correct any problems.
4.Note any circuit packs in the VINTAGE column stating: BOARD NOT PRESENT or CONFLICT.
Screen 4-2. Example System Configuration Screen
![]()
NOTE:
Under Assigned Ports, a “u” indicates unassigned ports and a number indicates the port has been translated.