2Install Telecommunications Cabling
Cable Installation | Page |
■Route the cable from the cabinet to the wall. Place the cable beside 1 of the rows of columns in the cable slack manager.
![]()
NOTE:
Retainers mounted on the columns keep the cable from protruding above the top of the base of the cable slack manager.
■Determine the length of the cable required to reach from the cable slack manager to the assigned connecting/terminal block.
■The cable must be supported on the wall using “D” rings.
■Cable slack is stored by coiling the cable around the columns in the cable slack manager. The first run should always go across the full length of the 5 columns in the cable slack manager.
■Connect the cable to the assigned connecting/terminal block.
■Avoid placing copper cables where they may bend or strain fiber optic cables.
Install Control Carrier Outputs Cable
A connector on the rear of the Control Carrier is labeled AUX. A
■Alarm monitoring for the processor interface
■7 DC power
■3 DC power
■The remote maintenance internal modem connection location
■Access to a relay contact is available to actuate a light, bell, or similar type
Label Control Carrier Cable
Place the appropriate AUX connector label on the assigned