
DEFINITY Enterprise Communications Server Release 6 | Issue 5 |
Installation and Test for | May 1998 |
1 Install and Connect Cabinets |
|
Unpack and Inspect Cabinets | Page |
|
|
1 |
|
Install and Connect Cabinets | 1 |
|
This chapter discusses installation of
Floor plans and equipment layouts for typical system installations are provided in DEFINITY Enterprise Communications Server Release 6 System Description Pocket Reference.
Unpack and Inspect Cabinets
Perform these steps for all cabinets.
!
DANGER:
A cabinet may weigh as much as 800 lbs (363 kg) and may be top heavy.
Use extreme caution.
1.Check the status of the SHOCKWATCH and/or TILTWATCH indicators on the container. If the container has been shaken or tilted beyond specifications, the indicators are red, indicating potential damage. Report any damage according to local shipping instructions.
!
DANGER:
Take care to avoid injury while cutting and removing the 2 metal bands.
2.Unpack the cabinet and remove all packing material.
3.Move the cabinets into their proper positions.
4.Do not adjust the leveling feet at this time.