
DEFINITY Enterprise Communications Server Release 6 | Issue 5 |
Installation and Test for | May 1998 |
C Cable Ductwork |
|
| Page |
|
|
Equipment room layout and expected growth determines which method to use.
Installation of an overhead rack is covered by Cable Racks
![]()
NOTE:
Install all screws in all appropriate places to comply with electromagnetic interference (EMI) requirements for shielding.
|
|
| duct1 KLC 071796 |
Figure Notes |
|
| |
1. | I/O | 4. | Front of Cabinets |
2. | Shielded Intercabinet Duct | 5. | I/O Ducts to |
3. | AC Power Cable Duct |
|
|