DEFINITY Enterprise Communications Server Release 6

Issue 5

Installation and Test for Multi-Carrier Cabinets 555-230-112

May 1998

C Cable Ductwork

 

 

Page C-2

 

 

Equipment room layout and expected growth determines which method to use.

Installation of an overhead rack is covered by Cable Racks (800-614-157).

NOTE:

Install all screws in all appropriate places to comply with electromagnetic interference (EMI) requirements for shielding.

 

 

 

duct1 KLC 071796

Figure Notes

 

 

1.

I/O Cross-Isle Trough

4.

Front of Cabinets

2.

Shielded Intercabinet Duct

5.

I/O Ducts to Cross-Connect Field

3.

AC Power Cable Duct

 

 

Figure C-1. Typical Layout of Assembled Ductwork

Page 349
Image 349
Lucent Technologies Release 6 manual Figure C-1. Typical Layout of Assembled Ductwork