DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets
555-230-112 Issue 5
May 1998
Test the System
Page 4-10Test Tone-Clock for each EPN
4
Test Tone-Clock for each EPN
1. Verify the screen disp lays: Command:
2. Type test tone-clock 2A (where 2A is the cabinet and c arrier number for
one of the Tone-Clocks installed) and press Ent er.
NOTE:
Circuit pack p ositions are usually given by c abinet, carrier, an d slot.
They may also be given b y port. The term “ cabinet” refers to 1
Multi-Carrier Cabinet making up one p ort network. A port network is
defined as a g roup of cab inets connected together with 1 TDM bu s.
If any result is FAIL, check the associated TDM b us cables and
intercabinet cab les in the EPN.
3. Repeat Step 2 for each installed Tone-Clock circuit pack.
Test Ton e -Clock Interchange for each EPN
Critical reliab ility only.
1. Verify the screen disp lays: Command:
2. Type status system all-cabinets and press Enter. This displays the
location of the Standby Tone-Clock.
3. Type set tone-clock xxx (where xxx is the port network/carrier for the
standby tone-cloc k). Press Enter.
4. Type status system all-cabinets and press Ente r.
5. Verify the duplic ated Tone-Clock is active using the information disp layed
on the screen.
If any problems are ind icated, c heck the TDM cab les in the associated
EPN.