4 Test the System

 

Check Circuit Pack Configuration Again

Page 4-12

 

 

6.Verify the MODEs of the expansion links have changed.

7.If any problems are indicated, check the TDM cables and the inter- cabinet cables in the associated EPN.

Check Circuit Pack Configuration

Again

1.Verify the screen displays: Command:

2.Type list configuration all and press Enter.

3.Verify all circuit packs installed in the system are listed in the reports. Refer to DEFINITY Enterprise Communications Server Release 6 Maintenance for R6r, to resolve any discrepancies.

System Test Completion

Save Translations

If any administration changes have been made, save and make a back up copy of the translations.

Next Steps

After the basic hardware is installed and tested, 3 more steps must be completed:

1.Install the telephones and other equipment. See Chapter 5, ‘Installand Wire Telephones and Other Equipment’.

2.Administer the features, telephones, and other equipment according to customer data on the provisioning plan. The data for system and telephone features can be administered using DEFINITY Enterprise Communications Server Release 6 Administration and Feature Description.

3.After the system is administered, test the telephones and other equipment using the procedures in Chapter 6, ‘TestTelephones and Other Equipment’.

NOTE:

It may be more efficient to install each hardware component, administer it, and test it before going on to install another component.