DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets
555-230-112 Issue 5
May 1998
Cable Ductwork
Page C-14
C
Install Cross-Aisle to Wall Trough
Refer to Figure C-9 to assemble the ductwork:
1. Install wall mounting bracket to desig nated location. Hardware to mount
bracket should b e determined ac c ording to wall type and should be
locally provid ed.
2. Use thread -f or min g screws to attach the 3-hole face of the angle b racket
to the I/O trough.
3. Attac h the angle brac ket to the 6-hole face of the cross-aisle brac ket using
three 10-24 X 3/4 inch screws, connected to nuts and washers through the
bottom holes.
4. Attac h the I/O cable d uc t to the cross-aisle brack et using the
thread-forming screws. Attac h the other end of the I/O duct to the wall
mounting using 10-24 X 3/4 inch screws, nuts and washers.
Figure C-9. In stallation of I/O Cross-Aisle to Wall Trough
Figure Notes
1. Ang le Brac ket
2. I/O Trough
3. Cross-Aisle Bracket
4. I/O Cab le Duct
5. Wall Mounting Bracket
6. Front of Cabinet
duct5KLC 071796