DEFINITY Enterprise Communications Server Release 6

Issue 5

Installation and Test for Multi-Carrier Cabinets 555-230-112

May 1998

 

 

5Install and Wire Telephones and Other Equipment

Add DS1 Tie and OPS

Page 5-91

Power Down System

NOTE:

Power down the PPN only if the existing Tone-Clock is being replaced in a standard reliability system.

1.At the PPN, set the main circuit breaker to OFF.

2.At each EPN, set the main circuit breaker to OFF.

Add Circuit Packs

1.Determine the port assignments of the circuit packs to be added.

2.Install the TN722B DS1 Tie Trunk, the TN767C DS1 Interface, or TN464C DS1 Interface circuit pack in assigned carrier slot.

3.Replace an existing TN756 Tone Detector/Generator circuit pack with: a. TN768, TN780, or a non-United States TN419B Tone-Clock

b. TN748B or a non-United States TN420B Tone Detector

Install Cables

Install H600-307 cable from the cabinet to a Channel Service Unit (CSU) and install cables from the CSU to the MDF as required.

Power Up System

1.At each EPN, set the main circuit breaker to ON.

2.At the PPN, set the main circuit breaker to ON.

3.The system performs the level 4 rebooting process, loading the system translations from the translation card or tape. Rebooting takes 8 to 11 minutes.

4.After the system reboot is finished and all trouble is cleared, verify that the EMERGENCY TRANSFER CONTROL switch is set to AUTO. This restores the system to the normal mode.

Enter Added Translations

Administer forms listed under “DS1 Tie Trunk Service” in DEFINITY Enterprise Communications Server Release 6 Administration and Feature Description.

Page 242
Image 242
Lucent Technologies Release 6 manual Power Down System, Add Circuit Packs, Install Cables, Power Up System