Lucent Technologies Release 6 manual Install I/O Cable Rack Coupling

Models: Release 6

1 453
Download 453 pages 12.94 Kb
Page 362
Image 362

DEFINITY Enterprise Communications Server Release 6

Issue 5

Installation and Test for Multi-Carrier Cabinets 555-230-112

May 1998

C Cable Ductwork

 

 

Page C-15

 

 

Install I/O Cable Rack Coupling

1.Attach I/O trough to top of cabinet using thread-forming screws. See Figure C-10.

2.Attach cross-aisle bracket to I/O trough using thread-forming screws through the top three holes on the bracket’s 6-hole face.

3.Attach I/O coupling trough to cross-aisle bracket using thread-forming screws.

4.Attach cable rack to coupling trough using locally-provided coupling plates and 3/8-18 x 1/2 inch hex head bolts with nuts.

5.Attach other end of cable rack to wall using locally-provided hardware.

 

 

 

duct6 KLC 071796

Figure Notes

 

 

1.

Cross-Aisle Bracket

5.

I/O Trough

2.

Coupling Plate

6.

Use Only When Required

3.

Cable Rack

7.

To Wall

4.

I/O Coupling Trough

 

 

Figure C-10. Installation of I/O Cable Rack Coupling to Rear of Cabinet

Page 362
Image 362
Lucent Technologies Release 6 manual Install I/O Cable Rack Coupling