
DEFINITY Enterprise Communications Server Release 6 | Issue 5 |
Installation and Test for | May 1998 |
|
|
2Install Telecommunications Cabling
Install Sneak Fuse Panels | Page |
Table
Table 2-2. Sneak Fuse Connector Pinout
Connector |
|
|
Pin | Pair/Fuse |
|
Numbers | Number |
|
26/1 | 1 |
|
27/2 | 2 |
|
28/3 | 3 |
|
29/4 | 4 |
|
30/5 | 5 |
|
31/6 | 6 |
|
32/7 | 7 |
|
33/8 | 8 |
|
34/9 | 9 |
|
35/10 | 10 |
|
36/11 | 11 |
|
37/12 | 12 |
|
38/13 | 13 |
|
39/14 | 14 |
|
40/15 | 15 |
|
41/16 | 16 |
|
42/17 | 17 |
|
43/18 | 18 |
|
44/19 | 19 |
|
45/20 | 20 |
|
46/21 | 21 |
|
47/22 | 22 |
|
48/23 | 23 |
|
49/34 | 24 |
|
50/25 | 25 |
|
|
|
|
6.Secure the top of each B25A cable with the captive screw on the connector.
7.Secure the bottom of each cable with a supplied cable tie wrap.