
DEFINITY Enterprise Communications Server Release 6 | Issue 5 |
Installation and Test for | May 1998 |
2 Install Telecommunications Cabling |
|
Station Circuit Distribution from Equipment Room | Page |
|
|
3-Pair to 4-Pair Station Circuit Distribution
Figure 2-22 shows the 3-pair circuit distribution from an equipment room MDF to
asatellite location using 110-type hardware. Four-pair circuits are distributed from the satellite location to the information outlets.
1
23
6
| 8 |
|
| 7 |
|
|
|
|
|
| |||
3 | 4 |
|
|
|
|
|
|
| 15 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
| 2 | 10 | 12 | |||||||
|
|
|
| ||||||||||
|
|
|
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
| ||||
| 9 |
|
|
|
|
|
| 13 | |||||
|
|
|
|
|
|
| 16 |
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 14 | |||
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8 | 4 | 11 |
|
|
|
| ||||||
Figure Notes:
1.Part of MDF
2.
3.Purple Field
4.White Field
5.Patch Cord or
6.To System Cabinet (3 Pair Modularity)
7.A25D Cable
8.B25A Cable
9.Connectorized (staggered finger) Multiple
10.
11.Blue Field
12.258A or BR2580A Adapter
13.Information Outlet
14.
15.Part of Satellite Location
16.