
DEFINITY Enterprise Communications Server Release 6 | Issue 5 |
Installation and Test for | May 1998 |
|
|
4 Test the System
Page
4 | Test the System | 4 |
| ||
|
|
The following tests provide verification of the TDM bus cables and terminators, and fiber optic
![]()
NOTE:
Refer to ‘‘LED Indicators’’ on page
1.The status of the system should be reviewed first.
2.Test the
3.Test the Switch Node carrier (Release 6r only).
4.Test Expansion Interface circuit packs,
Circuit pack positions are usually given by cabinet, carrier, and slot. They may also be given by port.
The term “ cabinet” refers to 1