DEFINITY Enterprise Communications Server Release 6

Issue 5

Installation and Test for Multi-Carrier Cabinets 555-230-112

May 1998

4 Test the System

 

Test TDM for each EPN

Page 4-9

 

 

Test TDM for each EPN

1.Verify the screen displays: Command:

2.Type test tdm port-network 2 and press Enter.

3.Verify a test results screen similar to Screen 4-8 is displayed.

Screen 4-8. Example Test Results for TDM Port Network 2

4.If result is FAIL for any test, check the connectors of the TDM bus cables in PPN 2.

5.Repeat these steps for each EPN to check the TDM bus cables.

Page 144
Image 144
Lucent Technologies Release 6 manual Test TDM for each EPN, Type test tdm port-network 2 and press Enter