Test TDM for each EPN | Page |
|
|
Test TDM for each EPN
1.Verify the screen displays: Command:
2.Type test tdm port-network 2 and press Enter.
3.Verify a test results screen similar to Screen
Screen 4-8. Example Test Results for TDM Port Network 2
4.If result is FAIL for any test, check the connectors of the TDM bus cables in PPN 2.
5.Repeat these steps for each EPN to check the TDM bus cables.