
DEFINITY Enterprise Communications Server Release 6 | Issue 5 |
Installation and Test for | May 1998 |
C Cable Ductwork |
|
| Page |
|
|
Table
Group Description
28Transition between older DIMENSION
29Shielded duct assembly transition from the front of a System
30I/O duct transition assembly for
31Shielded duct assembly transition from rear of a System
32 | AC power with a |
|
|
33 | Ladder rack supported 86 or 88.5 inches (218.4 cm or 224.7 cm) from floor |
|
|
34 | AC power duct with two |
|
|
35 | AC power duct with one |
|
|
37 | AC power duct with one |
|
|
39 | I/O |
|
|
41 | Basic hardware for one cabinet |
|
|
42 | Right or left end plate for shielded ductwork |
|
|
44 | Front and rear end plate for shielded ductwork |
|
|
51 | Shielded |
|
|
78 | Shielded |
Continued on next page
Install the various cable ducts in the order shown in Table
!
WARNING:
To prevent damage to the cabinet circuitry or cables, place cardboard or equivalent in the cable ducts to catch any metal filings that may fall from the