DEFINITY Enterprise Communications Server Release 6

Issue 5

Installation and Test for Multi-Carrier Cabinets 555-230-112

May 1998

 

 

5Install and Wire Telephones and Other Equipment

Add Packet Bus to R6si

Page 5-116

.

Table 5-23. Circuit-Pack Locations for Packet Bus in Each EPN

Circuit Pack

Carrier

Quantity

Slot

 

 

 

 

TN570

Expansion Control

1 or 21

EXPN INTFC/01 and /02

 

Carrier A

 

 

 

Port Carrier B

1 or 2

EXPN INTFC/02 and /03

 

 

 

 

TN771C

Expansion Control

12

Any Available Port Slot

 

Carrier A

 

 

 

 

 

 

1.Quantity of this pack should equal the number of EPNs.

2.Required for critical reliability EPN. Optional for digital trunk testing in high reliability EPN.

Power Up System

1.Power up the system.

2.Enter change system-parameters maintenance and press Enter. Use this form to enable the packet bus.

3.Perform tests.

Resolve Alarms

1.Examine the alarm log. Resolve any alarms that may exist using DEFINITY Enterprise Communications Server Release 6 Maintenance for R6r.

Contact INADS to Enable Customer Options and

Verify Alarm Origination

Be sure the system is part of the existing INADS database by calling the INADS Database Administrator at the Technical Service Center (TSC). Verify that INADS can dial into the system and that the system can dial out to INADS.

As part of the system registration process, the INADS Database Administrator enables Alarm Origination and enables customer options.

! CAUTION:

If you do not enable Alarm Origination when the customer has purchased a services contract, the system cannot report any alarm to the TSC automatically, causing the TSC to be unable to fulfill the services contract.

Page 267
Image 267
Lucent Technologies Release 6 manual Power up the system