DEFINITY Enterprise Communications Server Release 6

Issue 5

Installation and Test for Multi-Carrier Cabinets 555-230-112

May 1998

 

 

1Install and Connect Cabinets

Install System Cabinets

Page 1-4

Position the Auxiliary Cabinet (Optional)

1.Position the Auxiliary cabinet next to the PPN cabinet (or EPN cabinet, if installed). The location of equipment inside the Auxiliary cabinet is specified in the Customer Service Document (CSD).

2.If earthquake protection is required, skip to ‘Earthquake‘ Protection Installation’’ on page 1-34. Return to this section when finished.

3.If earthquake protection is not required, level the cabinets and adjust and lock the cabinet stabilizing bolts to keep the cabinet from moving.

Install Auxiliary Cabinet Equipment

The Auxiliary cabinet allows for carrier, 23-inch (58.4 cm) rack, or panel mounting of hardware. The following equipment is furnished with the cabinet.

■Fuse panel — Distributes -48 VDC power to fused cabinet circuits

■Power receptacle strip — Provides switched and unswitched 120 VAC receptacles

■DC connector block — Required when Auxiliary cabinet is powered by an external DC source

■AC to DC power supply — Converts AC power provided by the AC power strip switched outlet to the required DC voltage

1.Install equipment inside the cabinet as specified in the CSD. The following optional equipment can be installed:

■Audichron H9040 Wake-Up Announcement System

■909A/B Universal Coupler

■7400 Series Data Modules

■Z77A Multiple Data Mounting

■Fan Assembly — Requires 120 volt AC power

■COMSPHERE 3000-series modems

■External Channel Service Unit (CSU) — 1 is required for each T1 carrier link

■PagePac Paging System — 3 models are available. All PagePac models require 120 VAC power.

Page 21
Image 21
Lucent Technologies Release 6 manual Position the Auxiliary Cabinet Optional, Install Auxiliary Cabinet Equipment