DEFINITY Enterprise Communications Server Release 6

Issue 5

Installation and Test for Multi-Carrier Cabinets 555-230-112

May 1998

 

 

2Install Telecommunications Cabling

Install Sneak Fuse Panels

Page 2-14

 

 

 

Sneak

Current

Protector

507B

 

 

 

sneak CJL 032096

Figure Notes:

 

 

1.

Sneak Fuse Panel

3.

25-Pair Female Connector (Out)

2.

25-Pair Male Connector (In)

4.

220029 Fuses (Inside Panel). Use

 

 

 

Small Screwdriver to Pry Top Cover Off

Figure 2-7. Model 507B Sneak Fuse Panel

1.Locate the 507B near the network interface or the MDF.

2.Hold the panel against the mounting surface and mark the mounting screw locations. Drill pilot holes at the marked locations and partially install a locally obtained #12 x 3/4-inch screw into the 2 bottom mounting slots.

3.Slide the sneak fuse panel onto the mounting screws and tighten the screws securely.

4.Install a locally obtained #12 x 3/4-inch screw into the top 2 mounting slots and tighten securely.

5.Repeat the procedure for each sneak fuse panel.

Page 67
Image 67
Lucent Technologies Release 6 manual Model 507B Sneak Fuse Panel