DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets
555-230-112 Issue 5
May 1998
Install Telecommunications Cabling
Page 2-18Cable Installation
2
Cable Routing GuidelinesGeneral
The following guid elines should b e used when installing the equip ment room
cabling . Following these gu idelines will maxim ize use of the cab le sl ac k
managers and make future cab ling add itions and changes easier.
Figure 2-10 and Figure 2-11 show typical cab le routing from the cabinet to the
top and b ottom of the MDF, respectively.
Figure 2-10. Cable Routing to Top Terminal Blocks
Figure Notes:
1. Main Distribution Frame
2. AC Power Cord (AC-Powered
Cabinets Only)
3. Cable Slack Manager Number 1
4. Trunk/Auxiliary Field
5. Station Distribution Field
6. Cable Slack Mana g er Number 2
7. Cable Slack Mana g er Number 3
8. System Cabinet(s)
9. To Building Cables
10. 10 AWG (#25) (6 mm2) Wire to
Coupled Bonding Conductor
r758424b MMR 052996