DEFINITY Enterprise Communications Server Release 6

Issue 5

Installation and Test for Multi-Carrier Cabinets 555-230-112

May 1998

 

 

2Install Telecommunications Cabling

Cable Installation

Page 2-18

Cable Routing Guidelines

General

The following guidelines should be used when installing the equipment room cabling. Following these guidelines will maximize use of the cable slack managers and make future cabling additions and changes easier.

Figure 2-10 and Figure 2-11 show typical cable routing from the cabinet to the top and bottom of the MDF, respectively.

Figure Notes:

1.Main Distribution Frame

2.AC Power Cord (AC-Powered Cabinets Only)

3.Cable Slack Manager Number 1

4.Trunk/Auxiliary Field

5.Station Distribution Field

r758424b MMR 052996

6.Cable Slack Manager Number 2

7.Cable Slack Manager Number 3

8.System Cabinet(s)

9.To Building Cables

10.10 AWG (#25) (6 mm2) Wire to Coupled Bonding Conductor

Figure 2-10. Cable Routing to Top Terminal Blocks

Page 71
Image 71
Lucent Technologies Release 6 manual Cable Routing Guidelines General, Cable Routing to Top Terminal Blocks