DEFINITY Enterprise Communications Server Release 6

Issue 5

Installation and Test for Multi-Carrier Cabinets 555-230-112

May 1998

 

 

3Install Management Terminal and Activate System

Activate the System

Page 3-8

DC-Powered System

1.At the DC Battery Cabinet (if installed), set the circuit breaker to ON.

2.At the DC Power Cabinet, set the circuit breaker(s) on the rectifiers ON. This starts the system initialization and test. Some red LEDs may be on but are turned off by other procedures in this chapter.

3.If the system is high or critical reliability, power-up the EPN cabinet first, then the PPN cabinet. Always power up the PPN cabinet last.

Verify Messages on Terminal

1.After several minutes, verify all tests pass. Screen 3-1 displays the screen contents of a typical Release 6r system with 3 memory circuit packs. The Release 6si system screen is similar.

NOTE:

If any of the terminal messages indicate a test has failed or if the message

spe down mode” is displayed, refer to DEFINITY Enterprise Communications Server Release 6 Maintenance for R6r, or DEFINITY Enterprise Communications Server Release 6 Maintenance for R6vs/si, to clear the trouble.