3Install Management Terminal and Activate System
Activate the System | Page |
DC-Powered System
1.At the DC Battery Cabinet (if installed), set the circuit breaker to ON.
2.At the DC Power Cabinet, set the circuit breaker(s) on the rectifiers ON. This starts the system initialization and test. Some red LEDs may be on but are turned off by other procedures in this chapter.
3.If the system is high or critical reliability,
Verify Messages on Terminal
1.After several minutes, verify all tests pass. Screen
![]()
NOTE:
If any of the terminal messages indicate a test has failed or if the message
“spe down mode” is displayed, refer to DEFINITY Enterprise Communications Server Release 6 Maintenance for R6r, or DEFINITY Enterprise Communications Server Release 6 Maintenance for R6vs/si, to clear the trouble.