DEFINITY Enterprise Communications Server Release 6 | |
Installation and Test for Multi-Carrier Cabinets 555-230-112 | May 1998 |
Index | |
| |
| |
setting date and time, procedure, 3-15 shadow link
test procedure, 4-6 shipping packing list, 1-2 signaling leads, DC power, B-10 Singapore
country code, 3-13 single-mode attenuator, A-7 single-mode fiber, A-1,A-15 single-mode fiber transceiver, A-15
single-mode optical power measurement, A-6 single-phase 240VAC, 1-6
small battery holdover, 1-13 sneak current fuse panel, 2-13 sneak current protection, 2-13 Sneak Fuses, 2-13
Spain
country code, 3-13 speech synthesis, adding, 5-93 standby components
LEDs, 4-16 station cable
,2-28
25-pair,2-28
4-pair,2-29 bulk, 2-29
double modular plug-ended 4-pair,2-29 multiple 25-pair,2-28
single modular plug-ended 4-pair,2-29 status system all-cabinets
command, 4-2,4-7,4-10,4-11 switch node interface (SNI), LEDs, 4-15 switch processing element
interchange test procedure, 4-7 test procedure, 4-6
switch settings
572printer, B-5 CDR, B-8
external modem, B-2 printer, B-5
TN464 circuit pack, B-12 TN760 tie trunk, B-10
SYSAM circuit packs, 4-16 system grounding, 1-8 system maintenance, 3-18 system printer, B-5
system-parameters maintenance, 3-18
T
T1 Channel Service Unit, 5-9 Taiwan
country code, 3-13 TDM bus, B-12 telephone
pin designations, 5-12