DEFINITY Enterprise Communications Server Release 6 | Issue 5 |
Installation and Test for | May 1998 |
C Cable Ductwork |
|
| Page |
|
|
Mating Shielded Ducts to Risers
The new shielded ductwork is constructed so new
To attach the new shielded trough to a riser, first set it under the trough on the riser and install the other side of the trough as already described. Lift the trough as shown in Figure
newduct KLC 071696
Figure C-7. Shielded Duct Connected to Old Style Riser
Install Cross Aisle I/O Ductwork
1.If required, attach I/O endplate (group 6) to the
2.Install a
3.If
4.Place I/O