C Cable Ductwork

 

 

 

 

Page C-13

 

 

 

 

 

 

 

 

 

 

 

duct3 KLC 071796

Figure Notes

 

 

1.

I/O Trough

4.

I/O Endplate

2.

Use Only When Required

5.

Cross-Aisle I/O Trough or I/O Wall Trough

3.

Cross-Aisle Brackets

6.

Front of Cabinet

Figure C-8. Install Cross-Aisle I/O Ductwork or I/O Cross-Aisle to Wall

Trough

NOTE:

If wall trough is being installed, locally provided hardware is required at wall end of duct.