DEFINITY Enterprise Communications Server Release 6

Issue 5

Installation and Test for Multi-Carrier Cabinets 555-230-112

May 1998

 

 

2Install Telecommunications Cabling

Install Cable Slack Managers

Page 2-12

Install Cable Slack Managers

1.Place the Z113A Cable Slack Manager against the wall under the MDF. See Figure 2-6. Align the left side of the cable slack manager with the first terminal block of the trunk/auxiliary field.

2.Place the next cable slack manager beside the previously installed unit. Align the tabs and interlocks and snap the units together.

3.Repeat Step 2 until all cable slack managers are installed.

NOTE:

Nine 1/4-inch holes (0.63 cm) are provided in a cable slack manager base if earthquake mounting is required. If a base is mounted on an uneven floor, shims may be required for leveling and to assure proper fit of the covers.

Holes are provided in the sides of the base for bolting cable slack manager together. Bolts and shims must be obtained locally.

4.The system cables will route through the cable slack manager as shown. Complete cable routing is covered later in this chapter.

cbdfflr CJL 102396

Figure Notes:

1.

System Cabinet

4.

Spare Center Troughs

2.

Cable Slack Manager

5.

Cabinet Trough for Port Cables

3.

Cable Clamp

 

 

Figure 2-6. Cable Routing Through Cable Slack Manager

Page 65
Image 65
Lucent Technologies Release 6 manual Install Cable Slack Managers, Cable Routing Through Cable Slack Manager