Install Telecommunications Cabling
Page 2-24Cable Installation
2
Figure 2-14. 3-Pair Modularity for Trunk Pairs for 3-Pair Tie Trunks
Install Cables Between Cabinet and MDF
1. Install ā€œDā€ rings on the wall b etwe en the c able slack manag er and the
terminal/connecting blocks mounted on the MD F.
2. Install a self-ad hesive port label on the bac k of each connec tor on the
connector cab le. Labels should b e positioned so they are not covered by
the cabinet connec tor retainers.
3. At the rear of the cab inet, connect 1 end of the connector cab le to the
assigned conn ec tor.
4. Route the cab le down the rear of the cabinet, throug h the cable slack
manager, and to the MDF.
5. At the MDF, connec t the other end of the cabl e to the assig ned terminal/
connecting b lock connec tor.
6. Store the cab l e slac k in the cable slac k manag er.
7. Repe at Steps 2 throug h 6 unt il all c ables are installed.
Figure Notes:
1. Green Field
2. 1-Pair Jumpers
3. Pairs
4. Purple Field
123456789101112
123456789101112
123456789101112
1716151413 18 19 20 21 22 23 24