Lucent Technologies Release 6 manual Add Circuit Packs

Models: Release 6

1 453
Download 453 pages 12.94 Kb
Page 215
Image 215

DEFINITY Enterprise Communications Server Release 6

Issue 5

Installation and Test for Multi-Carrier Cabinets 555-230-112

May 1998

 

 

5Install and Wire Telephones and Other Equipment

Add Circuit Packs

Page 5-64

Add Circuit Packs

When installing additional features or equipment, it may be necessary to install additional port circuit packs. See Figure 5-16 for a list of circuit packs. This is a general procedure to use when adding features or equipment that require adding circuit packs.

1.Log onto the system and answer y to the Suppress Alarm Origination question during login.

2.Install the circuit pack into the carrier.

3.Log off the system after the addition (and any required administration) is complete.

NOTE:

If North American and non-United States circuit packs appear in the same row of a table, those circuit pack codes ordinarily used in North America appear in bold font to help distinguish these circuit packs from their non-United States counterparts. If only circuit packs commonly used for non-United States applications appear in a row of a table, the circuit-pack codes are enclosed in parentheses. If only circuit packs commonly used in North America appear in a row of a table, the circuit pack codes are enclosed in square brackets.

For information about connecting and administering non-United States circuit packs, refer to the Application Notes in DEFINITY Enterprise Communications Server Release 6 Administration and Feature Description.

Page 215
Image 215
Lucent Technologies Release 6 manual Add Circuit Packs